It is not the employer who pays the wages. He only handles the money.
It is the product that pays the wages.

Henry Ford

Lean projects

  • Heijunka

    In other words, levelled production. It is the foundation for the optimal use of resources and further developments.
  • 3P

    Preventing waste is more effective than eliminating it. Prevention may be achieved with the Production Preparation Process.
  • SMED

    Its objective is to reduce the changeover time of tools and machines, and in such a way it is possible to rationalise the size of batches.
  • TPM

    It serves to prevent machine break down and improve availability by reducing maintenance costs at the same time.
  • Creating product cells

    The layout and structure of assembly lines has a direct effect on product quality and production costs.
  • Jidoka

    The most state-of-the art quality assurance technique, it ensures the possibility of detecting and correcting faults immediately.
  • TCD

    It is a method for optimising the operation of automatic devices.
  • Kanban

    Its task is to integrate material and information flow, it is suitable for reducing and controlling stock levels.
  • PDCA

    The standard method of problem solving, it takes long years of practice to acquire it.
  • 5S

    This method helps create an effective, clean and well-organised workplace for the company.
  • LPMS

    Its a communication device used for breaking down the corporate goals and visualising the problems.
  • Standardisation

    There is no continuous improvement without standards, and creating the right standards is the key for good results.
  • Reducing machine down time

    The need for the production equipment to work efficiently calls for the elimination or prevention of technical and technological faults.
  • LCIA

    Its a low cost automation method of manual work stations.